Building a house?
Click here for information on the procedure to construct a nis and to establish a new water connection.
If you need a meter to build a house you must bring the following to WEB offices:
-
Building Permit from DOW.
-
Notary letter of the purchase or title deed of the property.
-
Copy of the plan with the location of the property, with stamp of approval by DOW.
-
Valid ID*
-
An extract from the population register (Uittreksel Bevolkingsregister better known as ‘Papel di 5 florin’)
-
For residents: Awg. 130,- for:
-
Security Deposit Awg. 80,-
-
Connection Awg. 50,-.
-
-
For non residents: Awg. 300,- for:
-
Security Deposit Awg. 250,-
-
Connection Awg. 50,-.
-
Once your house is constructed, you must notify us to change your construction water meter rate to a rate for households. Our water rates can be found here.
Please send your notification through our contact form or through our WEB ARUBA CHAT via WhatsApp 525-4600 and submit the following documents: