Building a House?

Find out all you need to know about meter connections with a new house

Building a house?

Click here for information on the procedure to construct a nis and to establish a new water connection.

If you need a meter to build a house you must bring the following to WEB offices:

  • Building Permit from DOW.
  • Notary letter of the purchase or title deed of the property.
  • Copy of the plan with the location of the property, with stamp of approval by DOW.
  • Valid ID.
  • An extract from the population register (Uittreksel Bevolkingsregister better known as ‘Papel di 5 Florin’).
  • For residents: Awg. 130,- for:
    • Security Deposit Awg. 80,-
    • Connection Awg. 50,-.
  • For non-residents: Awg. 300,- for:
    • Security Deposit Awg. 250,-
    • Connection Awg. 50,-.

Once your house is constructed, you must notify us to change your construction water meter rate to a rate for households. Our water rates can be found here.

Please send your notification through our contact form or through our WEB ARUBA CHAT via WhatsApp 525-4600 along with the following documents:

  • Valid ID.
  • 'Huisnummer Brief' from the Cenus Office.

You will receive confirmation that the water tariff has been changed.