Building a house?
Click here for information on the procedure to construct a nis and to establish a new water connection.
If you need a meter to build a house you must bring the following to WEB offices:
- Building Permit from DOW.
- Notary letter of the purchase or title deed of the property.
- Copy of the plan with the location of the property, with stamp of approval by DOW.
- Valid ID.
- An extract from the population register (Uittreksel Bevolkingsregister better known as ‘Papel di 5 Florin’).
- For residents: Awg. 130,- for:
- Security Deposit Awg. 80,-
- Connection Awg. 50,-.
- For non-residents: Awg. 300,- for:
- Security Deposit Awg. 250,-
- Connection Awg. 50,-.
Once your house is constructed, you must notify us to change your construction water meter rate to a rate for households. Our water rates can be found here.
Please send your notification through our contact form or through our WEB ARUBA CHAT via WhatsApp 525-4600 along with the following documents:
- Valid ID.
- 'Huisnummer Brief' from the Cenus Office.
You will receive confirmation that the water tariff has been changed.