| Equipment | Installed Capacity |
|---|---|
| FIRM CAPACITY (THERMAL) | |
| Recip Phase 1+2 (6 Engines) | 47.4 MW |
| Recip Phase 3 (4 Engines) | 45.6 MW |
| Recip Phase 3 Expansion (2 Engines) | 36.2 MW |
| Recip Phase 4 (6 Engines) | 103.2 MW |
| Gas Turbine (GT) | 20.0 MW |
| Total firm capacity | 252.4 MW |
| RENEWABLES | |
| Wind Turbines (WP-Vaderpiet) | 30.0 MW |
| Sunrise Solar Park | 6.1 MW |
| Total renewables | 36.1 MW |
| ENERGY STORAGE | |
| Battery Energy Storage System I (BESS I) | 1 MW / 4 MWh |
| Average load demand (2026) | 121 MW |
| Max peak load demand (2026) | 172 MW |